Schedule Checker A Microsoft Project


Scheduling Software Add-In

Features
Seamless Integration With Project 2010 Schedule Checker lives inside of Microsoft® Project 2010. After installing Schedule Checker, simply start Microsoft Project. Our scheduling software adds a new tab to the Project 2010 Ribbon menu which contains a helpful guide on the right side of the window.

Walkthrough Mode
In Walkthrough mode, Schedule Checker walks you through the process of improving your schedule. In this mode, Schedule Checker identifies issues one by one, explains them, and shows you how to fix them. Schedule Checker picks the order in an optimal way, so problems fixed early in the process remove issues that would have been addressed later in the process.

A Mentor Inside of Project 2010
Schedule Checker will teach you how to write a high quality schedule in Microsoft Project. Our scheduling software contains expertise gained from developing our Project Analyzer product since 2006. We worked with scheduling experts from every major Aerospace and Defense contractor to understand exactly how a critical path can become distorted and non-trustworthy. We built that expertise into Schedule Checker and delivered a product that is akin to having a scheduling mentor standing over your shoulder as you develop you project's schedule.

Highlight Filters
Schedule Checker is designed around fixing your schedule, not generating problem reports. Schedule Checker shows you the issues it finds by highlighting them inside of Microsoft Project. Instead of generating a report that must be manually cross-checked with your schedule, Schedule Checker takes you to the exact location of each issue and highlights the issue for you so you can fix it at the point of occurrence.

Three Level Ignore Controls
In cases where Schedule Checker finds something that really isn't an issue, we made it incredibly easy to tell Schedule Checker to stop flagging it as an issue. With three-level ignore, you can tell Schedule Checker to ignore a check for a specific task, stop checking for that issue with a particular schedule, or stop checking for that issue in any schedule.

Critical Path Before and After Indicator
As you fix your schedule, Schedule Checker shows you how the critical path has changed with a graphical before and after indicator. As it changes, you'll see the direct result of your work; a more accurate critical path.

Checks Performed:

  • Actual Date beyond the project status date
  • Actual Date in the future.
  • Missing Predecessors
  • Missing Successors
  • Planned Finish Date In The Past
  • Planned Start Date In The Past
  • Project is manually scheduled by default.
  • Summaries with predecessors
  • Summaries with Resources
  • Summaries with Successors
  • Tasks with Duration Too Long
  • Tasks with Duration Too Short
  • Tasks with finish to finish predecessors.
  • Tasks with hard constraints
  • Tasks with soft constraints
  • Tasks with negative total slack
  • Tasks without resources
  • Tasks with start to finish predecessors
  • Tasks with start to start predecessors
  • Tasks with lags associated with them
  • Tasks with leads associated with them
  • Manually Scheduled tasks